Remodeling the Outside of Your Dallas Home: What to Do First, Second and Last

Updating the outside of a home often means more than one project: a new roof, replacement windows, stucco or siding repairs, fresh paint and maybe new landscaping. Doing them in the wrong order can mean tearing out finished work to fix something else. This exterior remodeling planning timeline shows a sensible order of work for Dallas homes and explains why each step comes where it does.

Key takeaways

  • Plan the whole exterior at once, even if you build it in phases.
  • Work from the top down: roof first, then windows, then walls, then paint.
  • Fix hidden damage before new finishes cover it.
  • Landscaping and flatwork come last so they aren’t damaged during the work.

Stage 1: Plan, design and permit

Start by walking the house with a contractor and listing everything that needs attention. Decide what you want the finished house to look like. Choose materials and colors early, since some products take time to order.

Some exterior projects need city permits, such as structural changes, new openings or larger additions. Requirements depend on your city and your scope. In Dallas, the city’s Sustainable Development and Construction department handles building permits. Your contractor can help you understand what applies.

Stage 2: Roof and gutters

The roof comes first because roofing work can damage walls below, and because roof-to-wall flashing ties into the wall finish. New kick-out flashing and gutters set the stage for dry walls.

Stage 3: Windows and doors

Replacement windows and doors go in before new cladding or stucco finish. Their flashing must lap correctly with the wall’s water barrier. Installing windows after the finish means cutting into new work.

Stage 4: Wall repairs and cladding

With the roof and openings set, the walls get attention. This is when damaged sheathing is replaced, stucco repairs are made and new stucco, stone veneer or siding goes on. Any hidden water damage found here must be fixed before finishes cover it.

Stage 5: Paint and coatings

Paint and coatings come after all wall work has cured. Stucco needs time to cure before most coatings go on, so this stage may wait a few weeks after the walls are finished. Trim, doors and accents get painted at the same time.

Stage 6: Landscaping, flatwork and cleanup

Plants, mulch, sprinklers and new walkways come last. That way they aren’t trampled by scaffolding or splashed with material. Make sure soil and mulch stay below the bottom edge of stucco and siding.

A sample timeline

StageWhat to plan for
——
Planning and permitsTime for design choices, ordering and city review
RoofWeather-dependent; usually done in a short window
Windows and doorsOrder lead times can be the longest part
WallsDepends on repairs found and cure times for stucco
PaintWaits for stucco to cure; needs dry, mild days
LandscapingAfter all scaffolding is gone

Actual timing depends on your home, the scope and the weather. Your contractor should give you a schedule built around your project.

Tip: Order windows as soon as you decide on them. Lead times often decide the whole schedule, and everything after windows waits for them.

Phasing a remodel over time

If you can’t do everything at once, phase it in the same order. Roof and windows first, walls next, paint after. Doing paint first to “freshen things up” usually means repainting after the other work.

  • Keep a written plan of the full exterior so each phase fits the next.
  • Choose colors and materials for the full plan up front.
  • Fix leaks and hidden damage before cosmetic work, every time.

Living at home during the work

Most families stay home during exterior remodeling. Expect some noise, covered windows on the side being worked on and scaffolding around the house. Keep pets inside and move cars and outdoor furniture away from the walls.

Budgeting across the stages

Exterior budgets often get spent on the most visible items first. A smarter approach puts money into the roof, flashing and wall repairs first, since they protect everything else. Paint and landscaping can be scaled up or down at the end to match what is left.

Signs your plan is in the right order

If the plan starts with paint and ends with the roof, it is upside down. A good plan protects finished work at every step. Ask your contractor to explain why each stage comes where it does. Clear reasons are a sign of a well-thought-out project.

Following the exterior remodeling planning timeline with one team

Coordinating roofers, window installers, stucco crews and painters is a lot of work. Mark Daniel Exteriors offers roofing, siding and exterior remodeling, stucco work and exterior painting and stucco, so more of the timeline can be handled by one team. For larger projects, see our whole home renovation service.

Planning a full exterior update?
Tell us what you want to change and we can map out the order of work.

Send a project inquiry

FAQ

Does Mark Daniel Exteriors handle roofing and siding as well as stucco?

Yes. Roofing, siding and exterior remodeling is a listed residential service.

Does the company do exterior painting?

Yes. Exterior painting and stucco, and stucco painting, are listed services.

Is the company’s work guaranteed?

The company states a 100% guarantee on all labor and materials and offers warranties on goods and workmanship.

People Also Ask

What comes first, windows or siding?

Windows usually go in first, so their flashing can be lapped correctly with the wall’s water barrier before siding or stucco covers it.

What order do you paint the exterior of a house?

Painters usually work from the top down: gutters and fascia, then walls, then trim, doors and accents, so drips don’t land on finished areas.

How long does an exterior paint job last?

It depends on the surface, the products used, prep work and sun exposure. Walls facing strong afternoon sun usually need attention sooner than shaded walls.