A bathroom remodel packs many trades into a small room: demolition, plumbing, electrical, waterproofing, tile, cabinets and fixtures. Knowing the steps helps you plan, make decisions on time and understand what’s happening each day. This guide is for homeowners talking to bathroom remodel contractors in Plano and nearby Allen, Frisco and Richardson.
Key takeaways
- Make your selections before demolition starts.
- Plumbing and electrical rough-in happen before walls are closed.
- Waterproofing behind tile is the most important hidden step.
- Expect a short period without that bathroom, and plan for it.
Step 1: Design and selections
Decide on the layout and choose your fixtures, tile, vanity, countertops, lighting and paint. Having everything selected before work begins keeps the project moving. Items with long lead times should be ordered early.
Step 2: Demolition
Old fixtures, tile, damaged wall surfaces and flooring are removed. The crew protects nearby rooms and floors and controls dust. Hidden damage, like rot under a leaking toilet or behind old tile, often shows up here.
Step 3: Rough-in
Plumbing and electrical lines are moved or updated to match the new layout by licensed trades. Fans and lighting are wired. Many cities require an inspection before walls are closed.
Step 4: Waterproofing
Behind tile in showers and tub surrounds, a waterproof membrane or system keeps water out of the walls and floor. This step is hidden once tile goes on, but it decides how long the bathroom lasts.
Tip: Ask to see the shower waterproofing before tile is installed, and ask whether it was flood-tested. It’s your one chance to see it.
Step 5: Tile and surfaces
Tile goes on floors, walls and showers. Walls in dry areas are patched and painted. The vanity and countertops are set.
Step 6: Fixtures and finish
Toilets, faucets, shower trim, mirrors, lighting and accessories are installed. The crew cleans up, and you walk through together to note any final adjustments.
Choosing efficient fixtures
The EPA’s WaterSense program labels faucets, showerheads and toilets that meet its efficiency and performance criteria. Looking for the label is an easy way to compare products.
What’s included in a remodel
| Item | Often included |
|---|---|
| — | — |
| Layout changes | Moving fixtures, if plumbing allows |
| Shower or tub | New pan, waterproofing, tile or surround |
| Vanity and top | New cabinet, countertop and sink |
| Flooring | Tile or other water-resistant flooring |
| Lighting and fan | New fixtures and ventilation |
| Fixtures | Toilet, faucets, shower trim, accessories |
How long does a bathroom remodel take?
It depends on size, layout changes, inspections, tile work and material lead times. Your contractor should give you a schedule with key stages.
Living without the bathroom
If it’s your only full bathroom, plan ahead. Some families use a gym or stay with relatives for a few days during the most disruptive stages.
Ventilation and lighting
A good exhaust fan protects the bathroom from moisture damage and mildew. It should vent outside, not into the attic, and be sized for the room. Lighting matters too. A light on each side of the mirror gives even light for grooming, while a ceiling light or recessed lights brighten the room. Consider a light in the shower and a night light for late-night trips. These details are easy to plan during rough-in and hard to add later.
Keeping the project on budget
Set your budget early and share it with your contractor. Decide where to spend and where to save. Many homeowners spend on the shower and vanity and save on accessories. Keep a cushion for hidden damage, which is common in older bathrooms, and avoid changing selections after work begins.
Choosing the right tile
Tile sets the look of the bathroom and affects cleaning and safety. Floor tile should be slip-resistant, especially in showers. Larger tiles mean fewer grout lines to clean, while small mosaic tiles grip well on shower floors. Grout color matters too; darker grout hides stains better. Order extra tile for cuts and future repairs, and keep a few pieces after the job is done.
Small bathrooms, big impact
Plano has many homes with compact hall baths. Smart choices like a glass shower panel, a floating vanity and a large mirror can make a small room feel much bigger without moving walls. These changes often fit within the existing plumbing layout.
Working with a Plano bathroom remodel contractor
Plano is part of our service area. Mark Daniel Exteriors offers kitchen and bathroom remodeling and whole home renovation, and states a 100% guarantee on labor and materials. Read more on our about us page.
Planning a bathroom remodel in Plano?
Tell us about the room and what you want to change.
FAQ
Does Mark Daniel Exteriors serve Plano?
Yes. Plano is listed in the company’s service area.
Does the company remodel bathrooms?
Yes. Kitchen and bathroom remodeling is a listed residential service.
What does the company guarantee?
The company states a 100% guarantee on all labor and materials and offers warranties on goods and workmanship.
People Also Ask
What is included in a bathroom remodel?
It often includes layout changes, a new shower or tub with waterproofing, vanity and countertop, flooring, lighting and ventilation, and new fixtures.
Who to hire for a bathroom remodel?
Hire a remodeling contractor who coordinates demolition, licensed plumbing, waterproofing, tile and fixtures, and who provides a written scope.
How long does a bathroom remodel take?
It depends on size, layout changes, inspections, tile work and material lead times. Your contractor should give you a schedule for your project.